Pre-Yard Arrival
Checklist
Work through each section before the vessel leaves her berth. Every item confirms a decision with the yard, so nothing is settled at the gate on arrival day.
Yard Booking & Work Scope
Confirm the commercial and scheduling side of the yard period before the vessel leaves her berth.
Confirmed yard, haul-out slot and arrival window
Written confirmation of the yard, the lift or slip allocation and the date the vessel is expected.
Work order and estimate approved
Signed scope, pricing and a clear understanding of what the estimate excludes.
Change-order and delay procedure
How additional work is authorized, who signs, and what daily storage or delay charges apply.
Contracts, Insurance & Access
Paperwork that, if missing, stops the lift on arrival day.
Yard contract reviewed
Terms, indemnity, liability limits and payment schedule understood before signature.
Insurance certificate issued
Certificate naming the yard as additional insured where required, with coverage in force for the entire yard period.
Crew and vendor access authorized
Names, identification and permitted hours submitted so approved contractors are not turned away at the gate.
Vessel Documents & Records
Registration and ownership documents
Current registration or documentation, plus proof of ownership, available on arrival.
Insurance and classification records
Policy details and any class, flag-state or tonnage certificates the yard requires.
Surveys, drawings and manuals on file
Prior reports, systems drawings and equipment manuals shared with the yard in advance.
Pre-Arrival Vessel Readiness
Decisions made before arrival save billable yard hours later.
Fuel, water and tank levels decided
Agree fuel and water levels with the yard, empty holding tanks and secure waste arrangements.
Loose gear and personal items secured or removed
Deck gear stowed, valuables and personal effects removed before the vessel is handed over.
Condition photographed before arrival
Hull, topsides, running gear and deck photographed and dated as a baseline record.
Systems and seacocks checked
Batteries, alarms and shore-power arrangements confirmed; seacocks and through-hulls verified.
Equipment, Materials & Deliveries
Owner-supplied equipment labeled
Every owner-supplied part or material labeled with vessel name and work order number.
Delivery instructions confirmed
Shipping address, receiving hours, site contact and storage responsibility agreed with the yard.
Hazardous or restricted materials approved
Flammables, gases and chemicals approved in writing and delivered with the required documentation.
Foreign-Trade Zone (FTZ) & Customs Readiness
Before scheduling work at an FTZ facility, confirm the vessel's eligibility, customs arrangements and operating restrictions with the yard's FTZ operator and appointed customs agent or broker.
Vessel flag and customs status
Record the vessel's flag, registration, ownership and current customs status. Confirm FTZ eligibility, the facility's activated FTZ area and the admission documents required before arrival.
Cruising-permit implications
Confirm whether the cruising license or permit must be surrendered for FTZ admission. Document the effect on vessel operations and the customs procedures required when leaving the FTZ or resuming cruising.
Imported equipment and spare parts
Identify imported equipment, replacement parts and owner-supplied materials before shipment. Confirm the importer of record, shipping instructions, customs documentation, applicable duties and approved procedures for delivery, installation, removal or re-export.
Bond, visitor-log and reporting requirements
Confirm required bonds, responsible parties, fees and submission deadlines. Establish procedures for crew lists, contractor and visitor logs, access restrictions, inventory records and required customs reporting.
Authorized vessel movements and sea trials
Confirm required written permissions before berth transfers, off-site repairs, sea trials or departure. Record permitted activities, destinations, time limits, return conditions and departure or arrival reporting requirements.
Responsibilities of the yard, agent and owner's representative
Document who handles each requirement:
Yard / FTZ operator: Facility procedures, access controls, zone records and operator filings.
Customs agent / broker: Customs advice, assigned filings, bond arrangements and coordination of required permissions.
FLYM / owner's representative: Collect vessel documents, coordinate approvals, track deadlines and costs, and confirm readiness with the captain and owner.
Requirements depend on the vessel, facility and applicable customs authorization. Confirm the arrangements before arrival, equipment shipment or vessel movement.
Security, Communications & Contacts
Access rules, keys and codes
Key, fob and alarm-code handling documented, with a record of who holds each.
Emergency and reporting contacts
Yard, project manager, captain and owner's representative contacts exchanged in writing.
Photo and report cadence agreed
Schedule for progress photographs, calls and written reports set for the duration of the work.
Final Yard-Arrival Confirmation
The last gate to clear before the vessel is committed to the yard.
Arrival time confirmed with the yard
Final call to the yard confirming lift or slip, gate access and receiving staff.
Vessel and documents on site
Captain or owner's representative present with documents, keys and the access list.
Signed condition report at handover
Joint walk-around with the yard, photographs attached and the record signed by both parties.